Qnect Logo

Standard Connection Cost Report

Company: - Josh Qnect -
Job Title: - Qnect Demo 2000 Tons -
B+Op Status: B+Op was disabled for some sessions of this job
Building Code: AISC-14
Design Type: LRFD
Engineering Units: Imperial
Bolt Catalog: ASTM Imperial
Profile Catalog: ASTM Imperial
Plate Material Grade Catalog: ASTM Imperial
Plate Thickness Catalog: Imperial
Detailing Distances Dimensions: Imperial
Materials: 
Weld E70
Shear Plate A572-GR.50
Angle A36
Bm Web Doubler Plate A572-GR.50
Stabilizer Plate A572-GR.50
End Plate A572-GR.50
Col Moment Plate A572-GR.50
Col Stiffener Plate A572-GR.50
Col Web Doubler Plate A572-GR.50

Summary Reports: Job Standard Summary  |  Job Sample Calcs Report    |  B+Op Connection Comparison Report  |  Standard Connection Cost Report
Job Preferences Report  |  No Connections Summary  |  No Connections Detailed    |  No Connections Reference Map
 
Shear and Axial Reports:Shear Plate: Specs  Strengths (Shear Only Connections)  Welds  Doublers  Connection Cost Report
    Strengths (Shear & Axial Connections)      
 Single Angle:  Specs  Strengths (Shear & Axial)  Welds  Doublers  Connection Cost Report
 Double Angle Reports:  Support Side Specs  Strengths (Shear & Axial)  Welds  Doublers  Connection Cost Report
    Beam Side Specs        
 End Plate Reports:  Specs  Strengths (Shear & Axial)  Welds  Connection Cost Report
 
Moment Reports: Specs  Support Strengths  Beam Flange Welds  Connection Cost Report
 Moment Plates:  Specs  Strengths  Welds  
 Column Stiffeners:  Specs  Strengths  Welds  
 Column Web Doublers:  Specs  Strengths  Welds  
 Shear Plate:  Specs  Strengths  Welds  
 Double Angle:  Support Side Specs  Strengths  Welds  
   Beam Side Specs      
 


Job NameFabricatorContract #General ContractorDate of this ReportNumber of Sessions
- Qnect Demo 2000 Tons -  Demo1  Demo  Demo  2025-11-05 07:59:53 204 




Material Costs


Shear Plate Totals

Number of Shear PlatesTotal Weight of Shear PlatesShear Plate Material Costs
1 3.84 $0


Filler Beam Web Doubler Totals

Number of DoublersTotal Weight of DoublersDoubler Material Costs
0 na na


Column Web MC Doubler Totals

Number of DoublersTotal Weight of DoublersDoubler Material Costs
0 na na


Stiffeners Totals

Count of StiffenersTotal Weight of StiffenersStiffeners Material Costs
0 na na


Bolted Flange Moment Plate Totals

Number of Bolted Flange PlatesTotal Weight of Bolted Flange PlatesBolted Flange Plate Material Costs
0 na na


Directly Welded Moment Plate Totals

Count of Directly Welded Moment PlateTotal Weight of Directly Welded Moment PlateDirectly Welded Moment Plate Material Costs
0 na na


Double Angle Totals

Number of Double AnglesNumber of AnglesTotal Weight of Double AnglesDouble Angle Material Costs
0 na na


Single Angle Totals

Number of Single AnglesTotal Weight of Single AnglesSingle Angle Material Costs
0 na na


End Plate Totals

Number of End PlatesTotal Weight of End PlatesEnd Plates Material Costs
0 na na


Shear Plate - Plate Washer Totals

Number of Plate WashersTotal Weight of Plate WashersPlate Washers Material Costs
0 na na


Other - Plate Washer Totals

Number of Plate WashersTotal Weight of Plate WashersPlate Washers Material Costs
0 na na


Beam Span Reduction Material Savings

Total Weight Due to Beam Span ReductionMaterial Savings
3.66 $2


Deck Support Plate Totals

Number of Deck Support PlatesTotal Weight of Deck Support PlatesDeck Support Plate Material Costs
0 na na


Stabilizer Plates Totals

Count of Stabilizer PlatesTotal Weight of Stabilizer PlatesStabilizer Plates Material Costs
0 na na


Gusset Plates Totals

Count of Gusset PlatesTotal Weight of Gusset PlatesGusset Plates Material Costs
0 na na


Bolted Flange Column Splice Plates Totals

Count of Bolted Flange Column Splice PlatesTotal Weight of Bolted Flange Column Splice PlatesBolted Flange Column Splice Plates Material Costs
0 na na


Filler Plates Totals

Count of Filler PlatesTotal Weight of Filler PlatesFiller Plates Material Costs
0 na na


Total Material Costs

Shear PlatesDoublersStiffenersMoment PlatesDouble AnglesSingle AnglesEnd PlatesPlate WashersDeck Support PlatesStabilizer PlatesGusset PlatesBolted Flange Column Splice PlatesFiller PlatesTotal Material Costs
$0 $0 na $0 na na na $0 na na na na na $0




Cope Costs


Cope Totals

Number of Top CopesTotal Top Cope Cut in.Number of Bottom CopesTotal Bottom Cope Cut in.Number of HSS Slot CopesTotal HSS Slots Cope Cut in.Cope Cut Cost Per in.Cope Costs
1 15.6875 0 0 0 0 $1.5 $24




Weld Costs

Weld Totals

Size Weld Type Designation Shop or Field Weld Total Count Total Length of Welds (in.) Number Weld Passes Per Inch Per Pass Total Weld Costs
0.2500 FILLET 4/16 FILLET, 4/16 FILLET SHOP_WELD 2 17.00 1 0.7 $12

Total Weld Weight (lb)

FILLET Weld WeightPJP Weld WeightCJP Weld WeightTotal Weld Weight (lb)
0.000.000.000.00

Total Weld Cost

FILLET Weld CostPJP Weld CostCJP Weld CostTotal Weld Cost
$12$0$0$12




Bolt Costs

Bolt Totals

Number of BoltsNumber of Holes per BoltShop/FieldBolt TypeBolt DiameterBolt Length
32FieldA325N_TC0.8753

Note: Bolt lengths are based on AISC standard plus 5/16"

Total Shop Bolt Costs

Number of BoltsNumber of Field BoltsNumber of Shop BoltsField Bolt Hardware CostsShop Bolt Hardware CostsShop Bolt Installation CostsWasher CostsNumber of Punched HolesNumber of Drilled HolesBolt Hole Cut CostsTotal Shop Bolt CostsShop Bolt CarbonField Bolt Carbon
330$5.31$0$0$030$6$000

Total Erector Bolt Installation Costs

Erector Bolt Installation CostsNumber of HolesShop Bolt CarbonField Bolt Carbon
$38300




Tonnage Totals

Total Weight of Qnected Beams and Columns (lbs)Total Weight of Qnected Beams and Columns (tons)
0.000.00




TOTALS

Total Costs

Doubler Material Costs
Number of Bolts
Framing Material Cost
Connection Material Costs
Cope Costs
Drilling Costs
Punching Costs
Cutting Costs
Fab Weld Costs
Fab Bolt Costs
Field Weld Costs
Install Bolt Costs
Total Fab Costs
Total Costs
$0
3
$-2
$0
$24
$0
$3
$0
$12
$0
$0
$38
$35
$74

Total Carbon (kg CO2e)

Doubler Material
(kg CO2e)
Number of Bolts
(kg CO2e)
Framing Material Carbon
(Additional Length Beyond Min)
Connection Material Carbon
(kg CO2e)
Coping Carbon
(kg CO2e)
Drilling Carbon
(kg CO2e)
Punching Carbon
(kg CO2e)
Cutting Carbon
(kg CO2e)
Fab Weld Carbon
(kg CO2e)
Fab Bolt Carbon
(kg CO2e)
Field Weld Carbon
(kg CO2e)
Install Bolt Carbon
(kg CO2e)
Total Fab Carbon
(kg CO2e)
Total Carbon
(kg CO2e)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00