Qnect Logo

B+Op Comparison & Cost Report

Company: - Josh Qnect -
Job Title: - Qnect Demo 2000 Tons -
Session Title: Baseline
Session Date: 2018-08-31 18:06:55
Model Name: Josh_Demo_2000_Tons.db1
B+Op Status: B+Op was disabled
Building Code: AISC-14
Design Type: LRFD
Engineering Units: Imperial
Bolt Catalog: ASTM Imperial
Profile Catalog: ASTM Imperial
Plate Material Grade Catalog: ASTM Imperial
Plate Thickness Catalog: Imperial
Detailing Distances Dimensions: Imperial
Materials: 
Weld E70
Shear Plate A572-GR.50
Angle A36
Bm Web Doubler Plate A572-GR.50
Stabilizer Plate A572-GR.50
End Plate A572-GR.50
Col Moment Plate A572-GR.50
Col Stiffener Plate A572-GR.50
Col Web Doubler Plate A572-GR.50

Summary Reports: Job Standard Summary  |  Job Sample Calcs Report  |  B+Op Comparison Report
Job Preferences Report  |  No Connections Summary  |  No Connections Detailed  |  No Connections Reference Map
 
Shear Plate Reports: Specs  Strengths (Shear Only Connections)  Strengths (Shear & Axial Connections)  Welds  Doublers
Single Angle Reports:  Specs  Strengths (Shear & Axial)  Welds  Doublers
Double Angle Reports:  Support Side Specs  Beam Side Specs  Strengths (Shear & Axial)  Welds  Doublers
End Plate Reports:  Specs  Strengths (Shear & Axial)  Welds
Moment Reports:  Specs  Support Strengths  Support Reinforcement Strengths  Moment Plate Strengths  Welds
Moment Group Reports:  Doubler Plate Specs  Doubler Plate Welds  Stiffener / Moment Plate Specs  Stiffener / Moment Plate Welds


Job NameFabricatorContract #General ContractorDate of this Report
- Qnect Demo 2000 Tons -  Demo1  Demo  Demo  2024-04-27 11:02:20




Material Costs


Shear Plate Totals

Number of Shear PlatesTotal Weight of Shear PlatesShear Plate Material Costs
0 na na


Filler Beam Web Doubler Totals

Number of DoublersTotal Weight of DoublersDoubler Material Costs
0 na na


Column Web MC Doubler Totals

Number of DoublersTotal Weight of DoublersDoubler Material Costs
0 na na


Stiffeners Totals

Count of StiffenersTotal Weight of StiffenersStiffeners Material Costs
0 na na


Bolted Flange Moment Plate Totals

Number of Bolted Flange PlatesTotal Weight of Bolted Flange PlatesBolted Flange Plate Material Costs
0 na na


Directly Welded Moment Plate Totals

Count of Directly Welded Moment PlateTotal Weight of Directly Welded Moment PlateDirectly Welded Moment Plate Material Costs
0 na na


Double Angle Totals

Number of Double AnglesNumber of AnglesTotal Weight of Double AnglesDouble Angle Material Costs
0 na na


Single Angle Totals

Number of Single AnglesTotal Weight of Single AnglesSingle Angle Material Costs
0 na na


End Plate Totals

Number of End PlatesTotal Weight of End PlatesEnd Plates Material Costs
0 na na


Shear Plate - Plate Washer Totals

Number of Plate WashersTotal Weight of Plate WashersPlate Washers Material Costs
0 na na


Other - Plate Washer Totals

Number of Plate WashersTotal Weight of Plate WashersPlate Washers Material Costs
0 na na


Beam Span Reduction Material Savings

Total Weight Due to Beam Span ReductionMaterial Savings
na na


Deck Support Plate Totals

Number of Deck Support PlatesTotal Weight of Deck Support PlatesDeck Support Plate Material Costs
0 na na


Stabilizer Plates Totals

Count of Stabilizer PlatesTotal Weight of Stabilizer PlatesStabilizer Plates Material Costs
0 na na


Gusset Plates Totals

Count of Gusset PlatesTotal Weight of Gusset PlatesGusset Plates Material Costs
0 na na


Bolted Flange Column Splice Plates Totals

Count of Bolted Flange Column Splice PlatesTotal Weight of Bolted Flange Column Splice PlatesBolted Flange Column Splice Plates Material Costs
0 na na


Total Material Costs

Shear PlatesDoublersStiffenersMoment PlatesDouble AnglesSingle AnglesEnd PlatesPlate WashersDeck Support PlatesStabilizer PlatesGusset PlatesBolted Flange Column Splice PlatesTotal Material Costs
na $0 na $0 na na na $0 na na na na $0




Cope Costs


Cope Totals

Number of Top CopesTotal Top Cope Cut in.Number of Bottom CopesTotal Bottom Cope Cut in.Number of HSS Slot CopesTotal HSS Slots Cope Cut in.Cope Cut Cost Per in.Cope Costs
0 0 0 0 0 0 na $0




Weld Costs

Weld Totals

Not Applicable.




Bolt Costs

Bolt Totals

Not Applicable

Note: Bolt lengths are based on AISC standard plus 5/16"

Total Shop Bolt Costs

Number of BoltsNumber of Field BoltsNumber of Shop BoltsField Bolt Hardware CostsShop Bolt Hardware CostsShop Bolt Installation CostsWasher CostsNumber of Punched HolesNumber of Drilled HolesBolt Hole Cut CostsTotal Shop Bolt Costs
nananananana

Total Erector Bolt Installation Costs

Erector Bolt Installation CostsNumber of Holes
na




Tonnage Totals

Total Weight of Qnected Beams and Columns (lbs)Total Weight of Qnected Beams and Columns (tons)
3,673,487.301,836.74




TOTALS

Session Name = Baseline

Total Costs

Total Doubler Material Costs
Total Number of Bolts
Total Material Costs
Total Cope Costs
Total Weld Costs
Total Shop Bolt Costs
Total Shop Costs
Total Erector Bolt Install Costs
Total Costs
$0
0
$0
$0
$0
$0
$0
$0
$0

Total Costs per Ton

Total Doubler Material Costs
(per ton)
Total Number of Bolts
(per ton)
Total Material Costs
(per ton)
Total Cope Costs
(per ton)
Total Weld Costs
(per ton)
Total Shop Bolt Costs
(per ton)
Total Shop Costs
(per ton)
Total Erector Bolt Install Costs
(per ton)
Total Costs
(per ton)
$0
0.00
$0
$0
$0
$0
$0
$0
$0