BOLT BEARING AT BEAM AND SHEAR PLATE SIDE
Vertical Shear Only Load Case:
ICR cordinate relative to CG = (8.48, -0.00)
At Row 1, At Column 1:
Ribolt = 39.32 kips
Ri vector at Beam = <18.43, 34.73>
Lcsbm at Beam spacing = na
Lcebm at Beam edge = 2.87 in.
(phi)Rnsbm at Beam spacing = (phi) * hf1 * Lcs * (tw/# shear planes) * Fu = na
(phi)Rnebm at Beam edge = (phi) * hf1 * Lce * (tw/# shear planes) * Fu = 0.75 * 1.20 * 2.87 * (0.32/1) * 65.00 = 52.80 kips/bolt
(phi)Rndbm on Beam at Bolt Diameter = (phi) * hf2 * db * (tw/# shear planes) * Fu = 0.75 * 2.40 * 1.00 * (0.32/1) * 65.00 = 36.86 kips/bolt
Beam bearing capacity, (phi)Rnbm = min((phi)Rnsbm,(phi)Rnebm,(phi)Rndbm) = min(na, 52.80, 36.86) = 36.86 kips/bolt
Ri vector at Shear Plate = <-18.43, -34.73>
Lcsshpl at Shear Plate spacing = na
Lceshpl at Shear Plate edge = 4.73 in.
(phi)Rnsshpl at Shear Plate spacing = (phi) * hf1 * Lcs * t * Fu = na
(phi)Rneshpl at Shear Plate edge = (phi) * hf1 * Lce * t * Fu = 0.75 * 1.20 * 4.73 * 0.38 * 65.00 = 103.78 kips/bolt
(phi)Rndshpl on Shear Plate at Bolt Diameter = (phi) * hf2 * db * t * Fu = 0.75 * 2.40 * 1.00 * 0.38 * 65.00 = 43.88 kips/bolt
Shear Plate bearing capacity, (phi)Rnshpl = min((phi)Rnsshpl,(phi)Rneshpl,(phi)Rndshpl) = min(na, 103.78, 43.88) = 43.88 kips/bolt
(phi)Rn = min((phi)Rnbm, (phi)Rnshpl) = min(36.86, 43.88) = 36.86 kips/bolt
Bolt Shear Demand to Bearing ratio = 36.86 / 39.32 = 0.94
At Row 2, At Column 1:
Ribolt = 39.00 kips
Ri vector at Beam = <6.80, 38.40>
Lcsbm at Beam spacing = 1.94 in.
Lcebm at Beam edge = 5.56 in.
(phi)Rnsbm at Beam spacing = (phi) * hf1 * Lcs * (tw/# shear planes) * Fu = 0.75 * 1.20 * 1.94 * (0.32/1) * 65.00 = 35.70 kips/bolt
(phi)Rnebm at Beam edge = (phi) * hf1 * Lce * (tw/# shear planes) * Fu = 0.75 * 1.20 * 5.56 * (0.32/1) * 65.00 = 102.50 kips/bolt
(phi)Rndbm on Beam at Bolt Diameter = (phi) * hf2 * db * (tw/# shear planes) * Fu = 0.75 * 2.40 * 1.00 * (0.32/1) * 65.00 = 36.86 kips/bolt
Beam bearing capacity, (phi)Rnbm = min((phi)Rnsbm,(phi)Rnebm,(phi)Rndbm) = min(35.70, 102.50, 36.86) = 35.70 kips/bolt
Ri vector at Shear Plate = <-6.80, -38.40>
Lcsshpl at Shear Plate spacing = 1.94 in.
Lceshpl at Shear Plate edge = 7.08 in.
(phi)Rnsshpl at Shear Plate spacing = (phi) * hf1 * Lcs * t * Fu = 0.75 * 1.20 * 1.94 * 0.38 * 65.00 = 42.50 kips/bolt
(phi)Rneshpl at Shear Plate edge = (phi) * hf1 * Lce * t * Fu = 0.75 * 1.20 * 7.08 * 0.38 * 65.00 = 155.26 kips/bolt
(phi)Rndshpl on Shear Plate at Bolt Diameter = (phi) * hf2 * db * t * Fu = 0.75 * 2.40 * 1.00 * 0.38 * 65.00 = 43.88 kips/bolt
Shear Plate bearing capacity, (phi)Rnshpl = min((phi)Rnsshpl,(phi)Rneshpl,(phi)Rndshpl) = min(42.50, 155.26, 43.88) = 42.50 kips/bolt
(phi)Rn = min((phi)Rnbm, (phi)Rnshpl) = min(35.70, 42.50) = 35.70 kips/bolt
Bolt Shear Demand to Bearing ratio = 35.70 / 39.00 = 0.92
At Row 3, At Column 1:
Ribolt = 39.00 kips
Ri vector at Beam = <-6.80, 38.40>
Lcsbm at Beam spacing = 1.94 in.
Lcebm at Beam edge = 8.61 in.
(phi)Rnsbm at Beam spacing = (phi) * hf1 * Lcs * (tw/# shear planes) * Fu = 0.75 * 1.20 * 1.94 * (0.32/1) * 65.00 = 35.70 kips/bolt
(phi)Rnebm at Beam edge = (phi) * hf1 * Lce * (tw/# shear planes) * Fu = 0.75 * 1.20 * 8.61 * (0.32/1) * 65.00 = 158.64 kips/bolt
(phi)Rndbm on Beam at Bolt Diameter = (phi) * hf2 * db * (tw/# shear planes) * Fu = 0.75 * 2.40 * 1.00 * (0.32/1) * 65.00 = 36.86 kips/bolt
Beam bearing capacity, (phi)Rnbm = min((phi)Rnsbm,(phi)Rnebm,(phi)Rndbm) = min(35.70, 158.64, 36.86) = 35.70 kips/bolt
Ri vector at Shear Plate = <6.80, -38.40>
Lcsshpl at Shear Plate spacing = 1.94 in.
Lceshpl at Shear Plate edge = 4.03 in.
(phi)Rnsshpl at Shear Plate spacing = (phi) * hf1 * Lcs * t * Fu = 0.75 * 1.20 * 1.94 * 0.38 * 65.00 = 42.50 kips/bolt
(phi)Rneshpl at Shear Plate edge = (phi) * hf1 * Lce * t * Fu = 0.75 * 1.20 * 4.03 * 0.38 * 65.00 = 88.42 kips/bolt
(phi)Rndshpl on Shear Plate at Bolt Diameter = (phi) * hf2 * db * t * Fu = 0.75 * 2.40 * 1.00 * 0.38 * 65.00 = 43.88 kips/bolt
Shear Plate bearing capacity, (phi)Rnshpl = min((phi)Rnsshpl,(phi)Rneshpl,(phi)Rndshpl) = min(42.50, 88.42, 43.88) = 42.50 kips/bolt
(phi)Rn = min((phi)Rnbm, (phi)Rnshpl) = min(35.70, 42.50) = 35.70 kips/bolt
Bolt Shear Demand to Bearing ratio = 35.70 / 39.00 = 0.92
At Row 4, At Column 1:
Ribolt = 39.32 kips
Ri vector at Beam = <-18.43, 34.73>
Lcsbm at Beam spacing = na
Lcebm at Beam edge = 3.73 in.
(phi)Rnsbm at Beam spacing = (phi) * hf1 * Lcs * (tw/# shear planes) * Fu = na
(phi)Rnebm at Beam edge = (phi) * hf1 * Lce * (tw/# shear planes) * Fu = 0.75 * 1.20 * 3.73 * (0.32/1) * 65.00 = 68.82 kips/bolt
(phi)Rndbm on Beam at Bolt Diameter = (phi) * hf2 * db * (tw/# shear planes) * Fu = 0.75 * 2.40 * 1.00 * (0.32/1) * 65.00 = 36.86 kips/bolt
Beam bearing capacity, (phi)Rnbm = min((phi)Rnsbm,(phi)Rnebm,(phi)Rndbm) = min(na, 68.82, 36.86) = 36.86 kips/bolt
Ri vector at Shear Plate = <18.43, -34.73>
Lcsshpl at Shear Plate spacing = na
Lceshpl at Shear Plate edge = 1.10 in.
(phi)Rnsshpl at Shear Plate spacing = (phi) * hf1 * Lcs * t * Fu = na
(phi)Rneshpl at Shear Plate edge = (phi) * hf1 * Lce * t * Fu = 0.75 * 1.20 * 1.10 * 0.38 * 65.00 = 24.06 kips/bolt
(phi)Rndshpl on Shear Plate at Bolt Diameter = (phi) * hf2 * db * t * Fu = 0.75 * 2.40 * 1.00 * 0.38 * 65.00 = 43.88 kips/bolt
Shear Plate bearing capacity, (phi)Rnshpl = min((phi)Rnsshpl,(phi)Rneshpl,(phi)Rndshpl) = min(na, 24.06, 43.88) = 24.06 kips/bolt
(phi)Rn = min((phi)Rnbm, (phi)Rnshpl) = min(36.86, 24.06) = 24.06 kips/bolt
Bolt Shear Demand to Bearing ratio = 24.06 / 39.32 = 0.61
Min Bolt Shear Demand to Bearing ratio Beam and Shear Plate for vertical shear only
= min(1.00, 0.94, 0.92, 0.92, 0.61) = 0.61
BEARING AT BEAM AND SHEAR PLATE SIDE SUMMARY:
Bearing Capacity at Vertical Shear Load Only, Rbv = Min Bolt Shear Demand to Bearing Ratio * Bolt Shear = 0.61 * 146.26 = 89.51 kips
Rbv = 89.51 kips >= Reaction V = 69.33 kips (OK) |
WELD:
Weld Requirements:
At shear only case:
Weld Length for shear, Lv = 12.00 in.
Shear Load per inch per weld, fv = R/Lv/2 = 69.33 / 12.00 / 2 = 2.89 kips/in/ weld
theta = 0 deg.
cPhi = 1.0 + 0.5 * sin(0)^1.5 = 1.00
Weld Coefficient = 0.60 * 70.00 * 1.00 * 1.00 * (2^0.5/2)*(1/16) = 1.86
Required weld size, Dv = fv/ (phi * coeff) = 2.89 / (0.75 * 1.86) = 2.08/16
Minimum fillet weld size :
At shear only load case = 0.13 in.
per Table J2.4 = 0.19 in.
5/8tp = 0.23 in.
user preference = 0.25 in.
Dmax1 (using AISC 14th Ed. eqn 9-3)
= tshpl * Fushpl / ( Fexx * C1 * 0.09)
= 0.38 * 65.00 / ( 70.00 * 1.00 * 0.09 )
= 3.94
Dmax2 (using AISC 14th Ed. eqn 9-2)
= tfcol * Fusupport / ( Fexx * C1 * 0.04 )
= 0.71 * 65.00 / ( 70.00 * 1.00 * 0.04 )
= 14.92
Dmax3 = project max fillet weld = 12.00
Dmax=min(Dmax1, Dmax2, Dmax3) = min(3.94, 14.92, 12.00)
= 3.94
Dihedral Angle, DA = 82.90 deg.
Gap on Obtuse Angle Side if No Bevel = 0.05 in.
Use weld size
Acute Side D1 = 4.00
Obtuse Side D2 = 4.00 (weld size is not increased on obtuse side for gap at skew less 1/16 in (2mm) per AWS D1.1/D1.1M (2015, p.511, C-5.21.1))
Weld Strength :
Vertical weld capacity during shear only load, phi * Rnv1 = 0.75 * 1.86 * 12.00 * (3.94 + 3.94) = 131.63 kips
131.63 kips >= Reaction V = 69.33 kips (OK)
Check Effective Throat:
Acute Side Effect throat = (D1/sin(DA)) * cos(DA/2) = (0.25/ sin( 82.90)) * cos( 41.45) = 0.19 in.
Obtuse Side Effect throat (with gap < 1/16 in (2mm)) = D2/sin(DA)*sin(DA/2) = 0.25 / sin(82.90) * sin(82.90 / 2) = 0.17 in.
Total Effective Throat = 0.19 + 0.17 = 0.36 in.
Total Effective Throat of Square Case = 5/8tp * 2^0.5 = 0.23 * 2^0.5 = 0.33 in.
0.36 >= 0.33 (OK) |