Qnect Logo

Connection Calcs Report

Company: - Josh Qnect -
Job Title: - Qnect Demo 2000 Tons -
Session Title: Baseline
Session Date: 2018-08-31 18:06:55
Model Name: Josh_Demo_2000_Tons.db1
B+Op Status: B+Op was disabled
Building Code: AISC-14
Design Type: LRFD
Engineering Units: Imperial
Bolt Catalog: ASTM Imperial
Profile Catalog: ASTM Imperial
Plate Material Grade Catalog: ASTM Imperial
Plate Thickness Catalog: Imperial
Detailing Distances Dimensions: Imperial
Materials: 
Weld E70
Shear Plate A572-GR.50
Angle A36
Bm Web Doubler Plate A572-GR.50
Stabilizer Plate A572-GR.50
End Plate A572-GR.50
Col Moment Plate A572-GR.50
Col Stiffener Plate A572-GR.50
Col Web Doubler Plate A572-GR.50

Summary Reports: Job Standard Summary  |  Job Sample Calcs Report  |  B+Op Comparison Report
Job Preferences Report  |  No Connections Summary  |  No Connections Detailed  |  No Connections Reference Map
 
Shear Plate Reports: Specs  Strengths (Shear Only Connections)  Strengths (Shear & Axial Connections)  Welds  Doublers
Single Angle Reports:  Specs  Strengths (Shear & Axial)  Welds  Doublers
Double Angle Reports:  Support Side Specs  Beam Side Specs  Strengths (Shear & Axial)  Welds  Doublers
End Plate Reports:  Specs  Strengths (Shear & Axial)  Welds
Moment Reports:  Specs  Support Strengths  Support Reinforcement Strengths  Moment Plate Strengths  Welds
Moment Group Reports:  Doubler Plate Specs  Doubler Plate Welds  Stiffener / Moment Plate Specs  Stiffener / Moment Plate Welds

Connection Number:
bb.2bb.s.00028.00487
 
Main Calcs:
DOUBLE ANGLES Bolted to Beam, Bolted to Support CONNECTION SUMMARY

Girder profile: W21X68
Filler Beam profile: W12X14
Slope: 0.00 deg.
Skew: 90.00
Vertical Offset: -9.25
Horizontal Offset: 0.00
Span: 11.67 ft.
Reaction, V: 25.00 kips
Shear Capacity, Rn: 31.30 kips
Design/Reference according to AISC 14th Ed. - ASD
Beam material grade: A992
Support material grade: A992
Angle material grade: A36
Angle1 Profile: L5X3-1/2X5/16
       Length = 8.000 in.
       Beam side bolts: 3 rows x 1 column 0.75 in. Diameter A325N bolts
       Beam side bolt vertical spacing: 3 in.
       Support side bolts: 3 rows x 1 column 0.75 in. Diameter A325N_TC bolts
       Support side bolt vertical spacing: 3 in.
Angle2 Profile: L5X3-1/2X5/16
       Length = 8.000 in.
       Beam side bolts: 3 rows x 1 column 0.75 in. Diameter A325N bolts
       Beam side bolt vertical spacing: 3 in.
       Support side bolts: 3 rows x 1 column 0.75 in. Diameter A325N_TC bolts
       Support side bolt vertical spacing: 3 in.

Configuration Geometry:

Beam setback = 0.5 in.
Edge distance at vertical edge of beam: 1.75 in.
Edge distance at bottom edge of beam: 1.65 in.
Bottom cope depth: 1.25 in.
Bottom cope length: 4 in.

Horizontal distance to first hole: 2.25 in.

Bolted Angle Leg At Beam : 
Angle 1 Leg Distances : 
   Down distance from top of filler beam flange : 3 in.
   Edge distance at vertical edge : 1.25 in.
   Edge distance at top edge : 1.00 in.
   Edge distance at bottom edge : 1.00 in.

Angle 2 Leg Distances : 
   Down distance from top of filler beam flange : 3 in.
   Edge distance at vertical edge : 1.25 in.
   Edge distance at top edge : 1.00 in.
   Edge distance at bottom edge : 1.00 in.

Bolted Angle Leg At Support : 
Angle 1 Leg Distances : 
   Down distance from top of filler beam flange : 3 in.
   Gage at Bolt : 3.25 in.
   Edge distance at vertical edge : 1.85 in.
   Edge distance at top edge : 1.00 in.
   Edge distance at bottom edge : 1.00 in.

Angle 2 Leg Distances : 
   Down distance from top of filler beam flange : 3 in.
   Gage at Bolt : 3.25 in.
   Edge distance at vertical edge : 1.85 in.
   Edge distance at top edge : 1.00 in.
   Edge distance at bottom edge : 1.00 in.

Holes in Beam Web : STD diameter = 0.8125 in.
Holes in Beam Angle Leg : STD diameter = 0.8125 in.
Holes in Support Girder : STD diameter = 0.8125 in.
Holes in Support Angle Leg : SSL slot width = 0.8125 in., slot length = 1 in.
Bolt Strength Calcs:
BOLT STRENGTH SUPPORT SIDE:

Angle 1 Bolt Strength (at Shear Load Only):
Gage ratio:  gage1 ratio = gage2 / (gage1 + gage2) = 3.25 / (3.25 + 3.25) = 0.5
Required tension stress (frt) = gage1 ratio * axial reaction    / bolt row count / bolt area  = 0.500 * 0.000 / 3 / 0.442 = 0.000 ksi
Required shear stress   (frv) = gage1 ratio * vertical reaction / bolt row count  / bolt area  = 0.50 * 25.00 / 3 / 0.44 = 9.43 ksi
C = no of bolts = 3.000
Using Table 7-1 to determine (1/omega) * rn:
Rn = (1/omega) * rn * C = 11.93 * 3.00 = 35.78 kips

Angle 1 Bolt Shear Strength Subtotal = 35.78 kips

Angle 2 Bolt Strength (at Shear Load Only):
Gage ratio:  gage2 ratio = gage1 / (gage1 + gage2) = 3.25 / (3.25 + 3.25) = 0.5
Required tension stress (frt) = gage2 ratio * axial reaction    / bolt row count / bolt area  = 0.500 * 0.000 / 3 / 0.442 = 0.000 ksi
Required shear stress   (frv) = gage2 ratio * vertical reaction / bolt row count  / bolt area  = 0.50 * 25.00 / 3 / 0.44 = 9.43 ksi
C = no of bolts = 3.000
Using Table 7-1 to determine (1/omega) * rn:
Rn = (1/omega) * rn * C = 11.93 * 3.00 = 35.78 kips

Angle 2 Bolt Shear Strength Subtotal = 35.78 kips


Total Support Side Bolt Shear Strength = min( Angle1 Bolt Shear/Gage1 Ratio , Angle2 Bolt Shear/Gage2 Ratio ) = min (71.57, 71.57) = 71.57 kips


BOLT STRENGTH BEAM SIDE:

At ShearPlane 1(Angle 1):
Bolt Strength:
C = no of bolts = 3.000
Using Table 7-1 to determine (1/omega) * rn:
Rn = (1/omega) * rn * C = 11.93 * 3.00 = 35.78 kips


At ShearPlane 2(Angle 2):
Bolt Strength:
C = no of bolts = 3.000
Using Table 7-1 to determine (1/omega) * rn:
Rn = (1/omega) * rn * C = 11.93 * 3.00 = 35.78 kips


Total Vertical Bolt Shear Strength = 
Min(ShearPlane 1 Shear Load Only / gage1 ratio, 
ShearPlane 2 Shear Load Only / gage2 ratio) = 
Min(35.78 / 0.5, 35.78 / 0.5) = 71.57 kips
Bolt Bearing Calcs:
BOLT BEARING AT BEAM SIDE:
Vertical Shear Only Load Case:
At ShearPlane 1
At Row 1, At Column 1:
Ri1 = 11.93 kips
Lcsbm at Beam spacing  = 2.19 in.
Lcebm at Beam edge    = 2.59 in.
1/omegaRnsbm at Beam spacing = 1/omega * hf1 * Lcs * (tw/# shear planes) * Fu = 0.50 * 1.20 * 2.19 * (0.20/2) * 65.00 = 8.53 kips/bolt
1/omegaRnebm at Beam edge = 1/omega * hf1 * Lce * (tw/# shear planes) * Fu = 0.50 * 1.20 * 2.59 * (0.20/2) * 65.00 = 10.12 kips/bolt
1/omegaRndbm on Beam at Bolt Diameter   = 1/omega * hf2 * db * (tw/# shear planes) * Fu = 0.50 * 2.40 * 0.75 * (0.20/2) * 65.00 = 5.85 kips/bolt
Beam bearing capacity, 1/omegaRnbm = min(1/omegaRnsbm,1/omegaRnebm,1/omegaRndbm) = min(8.53, 10.12, 5.85) = 5.85 kips/bolt
Lcsang1 at Angle 1 spacing  = 2.19 in.
Lceang1 at Angle 1 edge    = 6.59 in.
1/omegaRnsang1 at Angle 1 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang1 at Angle 1 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 6.59 * 0.31 * 58.00 = 71.82 kips/bolt
1/omegaRndang1 on Angle 1 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 1 bearing capacity, 1/omegaRnang1 = min(1/omegaRnsang1,1/omegaRneang1,1/omegaRndang1) = min(23.83, 71.82, 16.34) = 16.34 kips/bolt
1/omegaRn = min(Ri1, 1/omegaRnbm, 1/omegaRnang1) = min(11.93, 5.850, 16.339) = 5.85 kips/bolt


At Row 2, At Column 1:
Ri1 = 11.93 kips
Lcsbm at Beam spacing  = 2.19 in.
Lcebm at Beam edge    = 5.59 in.
1/omegaRnsbm at Beam spacing = 1/omega * hf1 * Lcs * (tw/# shear planes) * Fu = 0.50 * 1.20 * 2.19 * (0.20/2) * 65.00 = 8.53 kips/bolt
1/omegaRnebm at Beam edge = 1/omega * hf1 * Lce * (tw/# shear planes) * Fu = 0.50 * 1.20 * 5.59 * (0.20/2) * 65.00 = 21.82 kips/bolt
1/omegaRndbm on Beam at Bolt Diameter   = 1/omega * hf2 * db * (tw/# shear planes) * Fu = 0.50 * 2.40 * 0.75 * (0.20/2) * 65.00 = 5.85 kips/bolt
Beam bearing capacity, 1/omegaRnbm = min(1/omegaRnsbm,1/omegaRnebm,1/omegaRndbm) = min(8.53, 21.82, 5.85) = 5.85 kips/bolt
Lcsang1 at Angle 1 spacing  = 2.19 in.
Lceang1 at Angle 1 edge    = 3.59 in.
1/omegaRnsang1 at Angle 1 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang1 at Angle 1 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 3.59 * 0.31 * 58.00 = 39.14 kips/bolt
1/omegaRndang1 on Angle 1 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 1 bearing capacity, 1/omegaRnang1 = min(1/omegaRnsang1,1/omegaRneang1,1/omegaRndang1) = min(23.83, 39.14, 16.34) = 16.34 kips/bolt
1/omegaRn = min(Ri1, 1/omegaRnbm, 1/omegaRnang1) = min(11.93, 5.850, 16.339) = 5.85 kips/bolt


At Row 3, At Column 1:
Ri1 = 11.93 kips
Lcsbm at Beam spacing  = 2.19 in.
Lcebm at Beam edge    = 8.59 in.
1/omegaRnsbm at Beam spacing = 1/omega * hf1 * Lcs * (tw/# shear planes) * Fu = 0.50 * 1.20 * 2.19 * (0.20/2) * 65.00 = 8.53 kips/bolt
1/omegaRnebm at Beam edge = 1/omega * hf1 * Lce * (tw/# shear planes) * Fu = 0.50 * 1.20 * 8.59 * (0.20/2) * 65.00 = 33.52 kips/bolt
1/omegaRndbm on Beam at Bolt Diameter   = 1/omega * hf2 * db * (tw/# shear planes) * Fu = 0.50 * 2.40 * 0.75 * (0.20/2) * 65.00 = 5.85 kips/bolt
Beam bearing capacity, 1/omegaRnbm = min(1/omegaRnsbm,1/omegaRnebm,1/omegaRndbm) = min(8.53, 33.52, 5.85) = 5.85 kips/bolt
Lcsang1 at Angle 1 spacing  = 2.19 in.
Lceang1 at Angle 1 edge    = 0.59 in.
1/omegaRnsang1 at Angle 1 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang1 at Angle 1 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 0.59 * 0.31 * 58.00 = 6.47 kips/bolt
1/omegaRndang1 on Angle 1 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 1 bearing capacity, 1/omegaRnang1 = min(1/omegaRnsang1,1/omegaRneang1,1/omegaRndang1) = min(23.83, 6.47, 16.34) = 6.47 kips/bolt
1/omegaRn = min(Ri1, 1/omegaRnbm, 1/omegaRnang1) = min(11.93, 5.850, 6.467) = 5.85 kips/bolt


Bearing Capacity at Shear Plane 1 = Sum{ Bearing At [(Row)i,(Column)i] } = 
5.850 + 5.850 + 5.850 = 17.55 kips

At ShearPlane 2
At Row 1, At Column 1:
Ri2 = 11.93 kips
Lcsbm at Beam spacing  = 2.19 in.
Lcebm at Beam edge    = 2.59 in.
1/omegaRnsbm at Beam spacing = 1/omega * hf1 * Lcs * (tw/# shear planes) * Fu = 0.50 * 1.20 * 2.19 * (0.20/2) * 65.00 = 8.53 kips/bolt
1/omegaRnebm at Beam edge = 1/omega * hf1 * Lce * (tw/# shear planes) * Fu = 0.50 * 1.20 * 2.59 * (0.20/2) * 65.00 = 10.12 kips/bolt
1/omegaRndbm on Beam at Bolt Diameter   = 1/omega * hf2 * db * (tw/# shear planes) * Fu = 0.50 * 2.40 * 0.75 * (0.20/2) * 65.00 = 5.85 kips/bolt
Beam bearing capacity, 1/omegaRnbm = min(1/omegaRnsbm,1/omegaRnebm,1/omegaRndbm) = min(8.53, 10.12, 5.85) = 5.85 kips/bolt
Lcsang2 at Angle 2 spacing  = 2.19 in.
Lceang2 at Angle 2 edge    = 6.59 in.
1/omegaRnsang2 at Angle 2 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang2 at Angle 2 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 6.59 * 0.31 * 58.00 = 71.82 kips/bolt
1/omegaRndang2 on Angle 2 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 2 bearing capacity, 1/omegaRnang2 = min(1/omegaRnsang2,1/omegaRneang2,1/omegaRndang2) = min(23.83, 71.82, 16.34) = 16.34 kips/bolt
1/omegaRn = min(Ri2, 1/omegaRnbm, 1/omegaRnang2) = min(11.93, 5.850, 16.339) = 5.85 kips/bolt


At Row 2, At Column 1:
Ri2 = 11.93 kips
Lcsbm at Beam spacing  = 2.19 in.
Lcebm at Beam edge    = 5.59 in.
1/omegaRnsbm at Beam spacing = 1/omega * hf1 * Lcs * (tw/# shear planes) * Fu = 0.50 * 1.20 * 2.19 * (0.20/2) * 65.00 = 8.53 kips/bolt
1/omegaRnebm at Beam edge = 1/omega * hf1 * Lce * (tw/# shear planes) * Fu = 0.50 * 1.20 * 5.59 * (0.20/2) * 65.00 = 21.82 kips/bolt
1/omegaRndbm on Beam at Bolt Diameter   = 1/omega * hf2 * db * (tw/# shear planes) * Fu = 0.50 * 2.40 * 0.75 * (0.20/2) * 65.00 = 5.85 kips/bolt
Beam bearing capacity, 1/omegaRnbm = min(1/omegaRnsbm,1/omegaRnebm,1/omegaRndbm) = min(8.53, 21.82, 5.85) = 5.85 kips/bolt
Lcsang2 at Angle 2 spacing  = 2.19 in.
Lceang2 at Angle 2 edge    = 3.59 in.
1/omegaRnsang2 at Angle 2 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang2 at Angle 2 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 3.59 * 0.31 * 58.00 = 39.14 kips/bolt
1/omegaRndang2 on Angle 2 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 2 bearing capacity, 1/omegaRnang2 = min(1/omegaRnsang2,1/omegaRneang2,1/omegaRndang2) = min(23.83, 39.14, 16.34) = 16.34 kips/bolt
1/omegaRn = min(Ri2, 1/omegaRnbm, 1/omegaRnang2) = min(11.93, 5.850, 16.339) = 5.85 kips/bolt


At Row 3, At Column 1:
Ri2 = 11.93 kips
Lcsbm at Beam spacing  = 2.19 in.
Lcebm at Beam edge    = 8.59 in.
1/omegaRnsbm at Beam spacing = 1/omega * hf1 * Lcs * (tw/# shear planes) * Fu = 0.50 * 1.20 * 2.19 * (0.20/2) * 65.00 = 8.53 kips/bolt
1/omegaRnebm at Beam edge = 1/omega * hf1 * Lce * (tw/# shear planes) * Fu = 0.50 * 1.20 * 8.59 * (0.20/2) * 65.00 = 33.52 kips/bolt
1/omegaRndbm on Beam at Bolt Diameter   = 1/omega * hf2 * db * (tw/# shear planes) * Fu = 0.50 * 2.40 * 0.75 * (0.20/2) * 65.00 = 5.85 kips/bolt
Beam bearing capacity, 1/omegaRnbm = min(1/omegaRnsbm,1/omegaRnebm,1/omegaRndbm) = min(8.53, 33.52, 5.85) = 5.85 kips/bolt
Lcsang2 at Angle 2 spacing  = 2.19 in.
Lceang2 at Angle 2 edge    = 0.59 in.
1/omegaRnsang2 at Angle 2 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang2 at Angle 2 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 0.59 * 0.31 * 58.00 = 6.47 kips/bolt
1/omegaRndang2 on Angle 2 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 2 bearing capacity, 1/omegaRnang2 = min(1/omegaRnsang2,1/omegaRneang2,1/omegaRndang2) = min(23.83, 6.47, 16.34) = 6.47 kips/bolt
1/omegaRn = min(Ri2, 1/omegaRnbm, 1/omegaRnang2) = min(11.93, 5.850, 6.467) = 5.85 kips/bolt


Bearing Capacity at Shear Plane 2 = Sum{ Bearing At [(Row)i,(Column)i] } = 
5.850 + 5.850 + 5.850 = 17.55 kips


BEARING AT BEAM SIDE SUMMARY:

Bearing Capacity at Beam and Double Angles at Vertical Shear Load Only, Rbv1 =
Min(Sum{ Bearing At Shear Plane 1  [(Row)i,(Column)i] } / Gage1 Ratio, 
    Sum{ Bearing At Shear Plane 2  [(Row)i,(Column)i] } / Gage2 Ratio ) = Min( 17.55/ 0.50, 17.55/ 0.50 ) = 35.10 kips

BOLT BEARING AT SUPPORT SIDE:
Angle 1, Vertical Shear Loading: 
At Row 1, At Column 1:
Ri1 = 11.93 kips
Lcssupp at Support spacing  = 2.19 in.
Lcesupp at Support edge    = 8.44 in.
1/omegaRnssupp at Support spacing = 1/omega * hf1 * Lcs * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 2.19 * (0.43/1) * 65.00 = 36.68 kips/bolt
1/omegaRnesupp at Support edge = 1/omega * hf1 * Lce * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 8.44 * (0.43/1) * 65.00 = 141.60 kips/bolt
1/omegaRndsupp on Support at Bolt Diameter   = 1/omega * hf2 * db * (twsup/# bolt sides supported) * Fu = 0.50 * 2.40 * 0.75 * (0.43/1) * 65.00 = 25.15 kips/bolt
Support bearing capacity, 1/omegaRnsupp = min(1/omegaRnssupp,1/omegaRnesupp,1/omegaRndsupp) = min(36.68, 141.60, 25.15) = 25.15 kips/bolt
Lcsang1 at Angle 1 spacing  = 2.19 in.
Lceang1 at Angle 1 edge    = 0.59 in.
1/omegaRnsang1 at Angle 1 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang1 at Angle 1 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 0.59 * 0.31 * 58.00 = 6.47 kips/bolt
1/omegaRndang1 on Angle 1 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 1 bearing capacity, 1/omegaRnang1 = min(1/omegaRnsang1,1/omegaRneang1,1/omegaRndang1) = min(23.83, 6.47, 16.34) = 6.47 kips/bolt
1/omegaRn = min(Ri1, 1/omegaRnsupp, 1/omegaRnang1) = min(11.93, 25.155, 6.467) = 6.47 kips/bolt


At Row 2, At Column 1:
Ri1 = 11.93 kips
Lcssupp at Support spacing  = 2.19 in.
Lcesupp at Support edge    = 5.44 in.
1/omegaRnssupp at Support spacing = 1/omega * hf1 * Lcs * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 2.19 * (0.43/1) * 65.00 = 36.68 kips/bolt
1/omegaRnesupp at Support edge = 1/omega * hf1 * Lce * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 5.44 * (0.43/1) * 65.00 = 91.29 kips/bolt
1/omegaRndsupp on Support at Bolt Diameter   = 1/omega * hf2 * db * (twsup/# bolt sides supported) * Fu = 0.50 * 2.40 * 0.75 * (0.43/1) * 65.00 = 25.15 kips/bolt
Support bearing capacity, 1/omegaRnsupp = min(1/omegaRnssupp,1/omegaRnesupp,1/omegaRndsupp) = min(36.68, 91.29, 25.15) = 25.15 kips/bolt
Lcsang1 at Angle 1 spacing  = 2.19 in.
Lceang1 at Angle 1 edge    = 3.59 in.
1/omegaRnsang1 at Angle 1 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang1 at Angle 1 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 3.59 * 0.31 * 58.00 = 39.14 kips/bolt
1/omegaRndang1 on Angle 1 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 1 bearing capacity, 1/omegaRnang1 = min(1/omegaRnsang1,1/omegaRneang1,1/omegaRndang1) = min(23.83, 39.14, 16.34) = 16.34 kips/bolt
1/omegaRn = min(Ri1, 1/omegaRnsupp, 1/omegaRnang1) = min(11.93, 25.155, 16.339) = 11.93 kips/bolt


At Row 3, At Column 1:
Ri1 = 11.93 kips
Lcssupp at Support spacing  = 2.19 in.
Lcesupp at Support edge    = 2.44 in.
1/omegaRnssupp at Support spacing = 1/omega * hf1 * Lcs * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 2.19 * (0.43/1) * 65.00 = 36.68 kips/bolt
1/omegaRnesupp at Support edge = 1/omega * hf1 * Lce * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 2.44 * (0.43/1) * 65.00 = 40.98 kips/bolt
1/omegaRndsupp on Support at Bolt Diameter   = 1/omega * hf2 * db * (twsup/# bolt sides supported) * Fu = 0.50 * 2.40 * 0.75 * (0.43/1) * 65.00 = 25.15 kips/bolt
Support bearing capacity, 1/omegaRnsupp = min(1/omegaRnssupp,1/omegaRnesupp,1/omegaRndsupp) = min(36.68, 40.98, 25.15) = 25.15 kips/bolt
Lcsang1 at Angle 1 spacing  = 2.19 in.
Lceang1 at Angle 1 edge    = 6.59 in.
1/omegaRnsang1 at Angle 1 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang1 at Angle 1 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 6.59 * 0.31 * 58.00 = 71.82 kips/bolt
1/omegaRndang1 on Angle 1 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 1 bearing capacity, 1/omegaRnang1 = min(1/omegaRnsang1,1/omegaRneang1,1/omegaRndang1) = min(23.83, 71.82, 16.34) = 16.34 kips/bolt
1/omegaRn = min(Ri1, 1/omegaRnsupp, 1/omegaRnang1) = min(11.93, 25.155, 16.339) = 11.93 kips/bolt


Bearing Capacity at Shear Plane  = Sum{ Bearing At [(Row)i,(Column)i] } = 
6.467 + 11.928 + 11.928 = 30.32 kips


BOLT BEARING AT SUPPORT SIDE:
Angle 2, Vertical Shear Loading: 
At Row 1, At Column 1:
Ri1 = 11.93 kips
Lcssupp at Support spacing  = 2.19 in.
Lcesupp at Support edge    = 8.44 in.
1/omegaRnssupp at Support spacing = 1/omega * hf1 * Lcs * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 2.19 * (0.43/1) * 65.00 = 36.68 kips/bolt
1/omegaRnesupp at Support edge = 1/omega * hf1 * Lce * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 8.44 * (0.43/1) * 65.00 = 141.60 kips/bolt
1/omegaRndsupp on Support at Bolt Diameter   = 1/omega * hf2 * db * (twsup/# bolt sides supported) * Fu = 0.50 * 2.40 * 0.75 * (0.43/1) * 65.00 = 25.15 kips/bolt
Support bearing capacity, 1/omegaRnsupp = min(1/omegaRnssupp,1/omegaRnesupp,1/omegaRndsupp) = min(36.68, 141.60, 25.15) = 25.15 kips/bolt
Lcsang2 at Angle 2 spacing  = 2.19 in.
Lceang2 at Angle 2 edge    = 0.59 in.
1/omegaRnsang2 at Angle 2 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang2 at Angle 2 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 0.59 * 0.31 * 58.00 = 6.47 kips/bolt
1/omegaRndang2 on Angle 2 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 2 bearing capacity, 1/omegaRnang2 = min(1/omegaRnsang2,1/omegaRneang2,1/omegaRndang2) = min(23.83, 6.47, 16.34) = 6.47 kips/bolt
1/omegaRn = min(Ri1, 1/omegaRnsupp, 1/omegaRnang2) = min(11.93, 25.155, 6.467) = 6.47 kips/bolt


At Row 2, At Column 1:
Ri1 = 11.93 kips
Lcssupp at Support spacing  = 2.19 in.
Lcesupp at Support edge    = 5.44 in.
1/omegaRnssupp at Support spacing = 1/omega * hf1 * Lcs * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 2.19 * (0.43/1) * 65.00 = 36.68 kips/bolt
1/omegaRnesupp at Support edge = 1/omega * hf1 * Lce * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 5.44 * (0.43/1) * 65.00 = 91.29 kips/bolt
1/omegaRndsupp on Support at Bolt Diameter   = 1/omega * hf2 * db * (twsup/# bolt sides supported) * Fu = 0.50 * 2.40 * 0.75 * (0.43/1) * 65.00 = 25.15 kips/bolt
Support bearing capacity, 1/omegaRnsupp = min(1/omegaRnssupp,1/omegaRnesupp,1/omegaRndsupp) = min(36.68, 91.29, 25.15) = 25.15 kips/bolt
Lcsang2 at Angle 2 spacing  = 2.19 in.
Lceang2 at Angle 2 edge    = 3.59 in.
1/omegaRnsang2 at Angle 2 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang2 at Angle 2 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 3.59 * 0.31 * 58.00 = 39.14 kips/bolt
1/omegaRndang2 on Angle 2 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 2 bearing capacity, 1/omegaRnang2 = min(1/omegaRnsang2,1/omegaRneang2,1/omegaRndang2) = min(23.83, 39.14, 16.34) = 16.34 kips/bolt
1/omegaRn = min(Ri1, 1/omegaRnsupp, 1/omegaRnang2) = min(11.93, 25.155, 16.339) = 11.93 kips/bolt


At Row 3, At Column 1:
Ri1 = 11.93 kips
Lcssupp at Support spacing  = 2.19 in.
Lcesupp at Support edge    = 2.44 in.
1/omegaRnssupp at Support spacing = 1/omega * hf1 * Lcs * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 2.19 * (0.43/1) * 65.00 = 36.68 kips/bolt
1/omegaRnesupp at Support edge = 1/omega * hf1 * Lce * (twsup/# bolt sides supported) * Fu = 0.50 * 1.20 * 2.44 * (0.43/1) * 65.00 = 40.98 kips/bolt
1/omegaRndsupp on Support at Bolt Diameter   = 1/omega * hf2 * db * (twsup/# bolt sides supported) * Fu = 0.50 * 2.40 * 0.75 * (0.43/1) * 65.00 = 25.15 kips/bolt
Support bearing capacity, 1/omegaRnsupp = min(1/omegaRnssupp,1/omegaRnesupp,1/omegaRndsupp) = min(36.68, 40.98, 25.15) = 25.15 kips/bolt
Lcsang2 at Angle 2 spacing  = 2.19 in.
Lceang2 at Angle 2 edge    = 6.59 in.
1/omegaRnsang2 at Angle 2 spacing = 1/omega * hf1 * Lcs * t * Fu = 0.50 * 1.20 * 2.19 * 0.31 * 58.00 = 23.83 kips/bolt
1/omegaRneang2 at Angle 2 edge = 1/omega * hf1 * Lce * t * Fu = 0.50 * 1.20 * 6.59 * 0.31 * 58.00 = 71.82 kips/bolt
1/omegaRndang2 on Angle 2 at Bolt Diameter   = 1/omega * hf2 * db * t * Fu = 0.50 * 2.40 * 0.75 * 0.31 * 58.00 = 16.34 kips/bolt
Angle 2 bearing capacity, 1/omegaRnang2 = min(1/omegaRnsang2,1/omegaRneang2,1/omegaRndang2) = min(23.83, 71.82, 16.34) = 16.34 kips/bolt
1/omegaRn = min(Ri1, 1/omegaRnsupp, 1/omegaRnang2) = min(11.93, 25.155, 16.339) = 11.93 kips/bolt


Bearing Capacity at Shear Plane  = Sum{ Bearing At [(Row)i,(Column)i] } = 
6.467 + 11.928 + 11.928 = 30.32 kips


Bearing At Support Side Summary:
Bearing Capacity = min(At Angle1 Shear Only/Gage1 Ratio, At Angle2 Shear Only/Gage2 Ratio) = min(30.32/0.50, 30.32/0.50) = 60.65 kips
Beam Strength Calcs:
Web Depth = d - [Top Cope Depth] - [Bottom Cope Depth] = 11.9 - 0 - 1.25 = 10.65 in.
Gross Area (Shear) = [Web Depth] * tw = 10.65 * 0.20 = 2.13 in^2
Net Shear Area (Shear) = ([Web Depth] - ([# rows] * [Diameter + 0.0625])) * tw 
    = (10.65 - (3 * 0.88)) * 0.20 = 1.61 in^2

Using Eq.J4-3:
Shear Yielding = (1/omega) * 0.6 * Fybeam * [Gross Area] = 0.67 * 0.6 * 50.00 * 2.13 = 42.60 kips

Using Eq.J4-4:
Shear Rupture = (1/omega) * 0.6 * Fubeam * [Net Area] = 0.50 * 0.6 * 65.00 * 1.61 = 31.30 kips


Block Shear

Using Eq.J4-5:
Block Shear = {(1/omega) * ((0.6 * Fu * Anv) + (Ubs * Fu * Ant))} <= {(1/omega) * ((0.6 * Fy * Agv) + (Ubs * Fu * Ant))}

Block Shear not required.


Flexure at Longest Cope (Bottom Cope Only at Section)
Eccentricity at Section, e = 4.71 in.
Fy = 50.00 ksi
Snet1 (bolt holes not applicable) = 5.38 in^3
Snet2 (bolt holes applicable) = 5.38 in^3
Znet = 9.19 in^3

Using Eq. 9-19
Flexural Yielding = (1/omega) * Fy * Snet1 / e = 0.60 * 50.00 * 5.38 / 4.71 = 34.22 kips

Using Eq. 9-4
Flexural Rupture = (1/omega) * Fu * Znet / e = 0.50 * 65.00 * 9.19 / 4.71 = 63.37 kips


Flexure at Furthest Bolt Line within Cope (Bottom Cope Only at Section)
Eccentricity at Section, e = 2.46 in.
Fy = 50.00 ksi
Snet1 (bolt holes not applicable) = 5.38 in^3
Snet2 (bolt holes applicable) = 4.19 in^3
Znet = 7.38 in^3

Using Eq. 9-19
Flexural Yielding = (1/omega) * Fy * Snet1 / e = 0.60 * 50.00 * 5.38 / 2.46 = 65.45 kips

Using Eq. 9-4
Flexural Rupture = (1/omega) * Fu * Znet / e = 0.50 * 65.00 * 7.38 / 2.46 = 97.32 kips


Section Bending Strength Calculations Summary:

   Coped Beam Flexure at Longest Cope (Bottom Cope Only at Section)
   Flexural Yielding : 34.22 >= 25.00 kips (OK)
   Flexural Rupture : 63.37 >= 25.00 kips (OK)

   Coped Beam Flexure at Furthest Bolt Line within Cope (Bottom Cope Only at Section)
   Flexural Yielding : 65.45 >= 25.00 kips (OK)
   Flexural Rupture : 97.32 >= 25.00 kips (OK)
Double Angles Bolted Bolted Calcs:
Angle1 

Support Angle Leg 


Block Shear

Using Eq.J4-5:
Block Shear = {(1/omega) * ((0.6 * Fu * Anv) + (Ubs * Fu * Ant))} <= {(1/omega) * ((0.6 * Fy * Agv) + (Ubs * Fu * Ant))}
Block 1 (Shear): 
Gross Shear Length = (8 - 1) = 7.00 in.
Net Shear Length = 7 - (2.5 * (0.812 + 1/16)) = 4.81 in.
Gross Tension Length = [edge dist.] = 1.85 in.
Net Tension Length = (1.85 - (1 + 1/16)/2) = 1.32 in.
1. (1/omega) * [material thickness] * ((0.60 * Fua* [net shear length]) + (Ubs * Fua * [net tension length])) 
    = 0.50 * 0.31 * ((0.60 * 58.00 * 4.81) + (1.00 * 58.00 * 1.32)) = 38.18 kips
2. (1/omega) * [material thickness] * ((0.60 * Fya * [gross shear length]) + (Ubs * Fua * [net tension length])) 
    = 0.50 * 0.31 * ((0.60 * 36.00 * 7.00) + (1.00 * 58.00 * 1.32)) = 35.63 kips
Block Shear = 35.63 kips

Gross Area = 0.31 * 8.00 = 2.50 in^2
Net Area = (8.00 - (3 *(0.81 + 1/16)) * 0.31 = 1.68 in^2

Using Eq.J4-3:
Shear Yielding = (1/omega) * 0.6 * Fya * [Gross Area] = 0.67 * 0.6 * 36.00 * 2.50 = 36.06 kips

Using Eq.J4-4:
Shear Rupture = (1/omega) * 0.6 * Fua * [Net Area] = 0.50 * 0.6 * 58.00 * 1.68 = 29.27 kips


Beam Angle Leg 

Gross Area = 0.31 * 8.00 = 2.50 in^2
Net Area = (8.00 - (3 *(0.81 + 1/16)) * 0.31 = 1.68 in^2

Using Eq.J4-3:
Shear Yielding = (1/omega) * 0.6 * Fya * [Gross Area] = 0.67 * 0.6 * 36.00 * 2.50 = 36.06 kips

Using Eq.J4-4:
Shear Rupture = (1/omega) * 0.6 * Fua * [Net Area] = 0.50 * 0.6 * 58.00 * 1.68 = 29.27 kips


Block Shear

Using Eq.J4-5:
Block Shear = {(1/omega) * ((0.6 * Fu * Anv) + (Ubs * Fu * Ant))} <= {(1/omega) * ((0.6 * Fy * Agv) + (Ubs * Fu * Ant))}
Block 1 (Shear): 
Gross Shear Length = (8 - 1) = 7.00 in.
Net Shear Length = 7 - (2.5 * (0.812 + 1/16) = 4.81 in.
Gross Tension Length = [edge dist.] = 1.25 in.
Net Tension Length = (1.25 - (0.812 + 1/16)/2) = 0.81 in.
1. (1/omega) * [material thickness] * ((0.60 * Fua* [net shear length]) + (Ubs * Fua * [net tension length])) 
    = 0.50 * 0.31 * ((0.60 * 58.00 * 4.81) + (1.00 * 58.00 * 0.81)) = 33.58 kips
2. (1/omega) * [material thickness] * ((0.60 * Fya * [gross shear length]) + (Ubs * Fua * [net tension length])) 
    = 0.50 * 0.31 * ((0.60 * 36.00 * 7.00) + (1.00 * 58.00 * 0.81)) = 31.04 kips
Block Shear = 31.04 kips



Angle2 

Support Angle Leg 


Block Shear

Using Eq.J4-5:
Block Shear = {(1/omega) * ((0.6 * Fu * Anv) + (Ubs * Fu * Ant))} <= {(1/omega) * ((0.6 * Fy * Agv) + (Ubs * Fu * Ant))}
Block 1 (Shear): 
Gross Shear Length = (8 - 1) = 7.00 in.
Net Shear Length = 7 - (2.5 * (0.812 + 1/16)) = 4.81 in.
Gross Tension Length = [edge dist.] = 1.85 in.
Net Tension Length = (1.85 - (1 + 1/16)/2) = 1.32 in.
1. (1/omega) * [material thickness] * ((0.60 * Fua* [net shear length]) + (Ubs * Fua * [net tension length])) 
    = 0.50 * 0.31 * ((0.60 * 58.00 * 4.81) + (1.00 * 58.00 * 1.32)) = 38.18 kips
2. (1/omega) * [material thickness] * ((0.60 * Fya * [gross shear length]) + (Ubs * Fua * [net tension length])) 
    = 0.50 * 0.31 * ((0.60 * 36.00 * 7.00) + (1.00 * 58.00 * 1.32)) = 35.63 kips
Block Shear = 35.63 kips

Gross Area = 0.31 * 8.00 = 2.50 in^2
Net Area = (8.00 - (3 *(0.81 + 1/16)) * 0.31 = 1.68 in^2

Using Eq.J4-3:
Shear Yielding = (1/omega) * 0.6 * Fya * [Gross Area] = 0.67 * 0.6 * 36.00 * 2.50 = 36.06 kips

Using Eq.J4-4:
Shear Rupture = (1/omega) * 0.6 * Fua * [Net Area] = 0.50 * 0.6 * 58.00 * 1.68 = 29.27 kips


Beam Angle Leg 

Gross Area = 0.31 * 8.00 = 2.50 in^2
Net Area = (8.00 - (3 *(0.81 + 1/16)) * 0.31 = 1.68 in^2

Using Eq.J4-3:
Shear Yielding = (1/omega) * 0.6 * Fya * [Gross Area] = 0.67 * 0.6 * 36.00 * 2.50 = 36.06 kips

Using Eq.J4-4:
Shear Rupture = (1/omega) * 0.6 * Fua * [Net Area] = 0.50 * 0.6 * 58.00 * 1.68 = 29.27 kips


Block Shear

Using Eq.J4-5:
Block Shear = {(1/omega) * ((0.6 * Fu * Anv) + (Ubs * Fu * Ant))} <= {(1/omega) * ((0.6 * Fy * Agv) + (Ubs * Fu * Ant))}
Block 1 (Shear): 
Gross Shear Length = (8 - 1) = 7.00 in.
Net Shear Length = 7 - (2.5 * (0.812 + 1/16) = 4.81 in.
Gross Tension Length = [edge dist.] = 1.25 in.
Net Tension Length = (1.25 - (0.812 + 1/16)/2) = 0.81 in.
1. (1/omega) * [material thickness] * ((0.60 * Fua* [net shear length]) + (Ubs * Fua * [net tension length])) 
    = 0.50 * 0.31 * ((0.60 * 58.00 * 4.81) + (1.00 * 58.00 * 0.81)) = 33.58 kips
2. (1/omega) * [material thickness] * ((0.60 * Fya * [gross shear length]) + (Ubs * Fua * [net tension length])) 
    = 0.50 * 0.31 * ((0.60 * 36.00 * 7.00) + (1.00 * 58.00 * 0.81)) = 31.04 kips
Block Shear = 31.04 kips



Total Support Side Shear Yielding Capacity =  min(YieldAngle1/Gage1 Ratio, YieldAngle2/Gage2 Ratio) =  min(72.1152 , 72.1152) = 72.1152 kips
Total Support Side Shear Rupture Capacity =  min(RuptureAngle1/Gage1 Ratio, RuptureAngle2/Gage2 Ratio) = min(58.5466 , 58.5466) = 58.5466 kips
Total Support Side Vertical Block Shear Capacity =  min(BlockAngle1/Gage1 Ratio, BlockAngle2/Gage2 Ratio) = min(71.2662 , 71.2662) = 71.2662 kips
Total Beam Side Shear Yielding Capacity =  min (YieldAngle1/Gage1 Ratio , YieldAngle2/Gage2 Ratio) = min(72.1152 , 72.1152) = 72.1152 kips
Total Beam Side Shear Rupture Capacity =  min (RuptureAngle1/Gage1 Ratio , RuptureAngle2/Gage2 Ratio) = min(58.5466 , 58.5466) = 58.5466 kips
Total Beam Side Vertical Block Shear Capacity =  min (BlockAngle1/Gage1 Ratio , BlockAngle2/Gage2 Ratio) = min(62.0757 , 62.0757) = 62.0757 kips
Weld Calcs:
(Not applicable / No results )